Calaca II Power Plant

Project: Cala II Power Plant

Location: Calaca, Batangas

Scope of Work:

  • Boiler Proper; Air/Gas Duct; Fuel Equipment; Fuel Oil Pipings; Fans (IDF, FDF, PAF) Major; Pipings (MS,HTR, LTR); Other Piping Electrostatic (EP) Plant Equip’t.
  • Temporary Power Distribution System
  • Fabrication & Installation of Emergency Chute
  • Installation of Coal Handling Downspout
  • Fabrication and Installation of Walkway (Hand Railing & Grafting Cover) & Oversize Refuse Chute
  • Demineralized Water Tank, Heavy Oil Storage Tank, Light Oil Storage and Condensate Storage Tank
  • Painting & Sandblasting (902,000 sq.m.), Boiler Structures/Boiler Equipment; Coal Handing Structures/Conveyor; Plant Equipment/Elevator Tanks, Air/Gas Duct, Stacker/Reclaimer Ash Handling Equip’t. Water Treatment Plant
  • Raw Materials By-Pass Cable Work & Civil Works

Owner/Client: MITSUBISHI Heavy Industries Nagasaki, Japan

Related Projects

MRT-3 Rail Grinding Works

Location: EDSA, From North Ave. Station to Taft Ave. Station (North Bound and South Bound)
Scope of Work: Rail Grinding Works
Owner/Client: TES Phils./DOTC/DOTr – MRT3/Busan Universal Rail, Inc.